Saturday, April 25, 2015

Yard work

Trip south Friday








Saturday morning working hard!!























Day 1


After a few cuts.


Progress.





As clean as its getting.


The work crew. Me, Angie, Butch, Brian. Working hard today!!


Hey ya'll watch this!!


Ok they survived. But still. Crazy boys!!


Working on the poke saw.


Damage :(


This pile is about 30' long 7+' high and a 6' wide


Logs, logs, logs....we left a small pile in the back yard for the fire pit.
And with that angels and I are pure wore out and Butch is beat to heck!

Sunday, April 19, 2015

Ttttttiiiimmmmmmbbbbbeeeeerrrrrrr!

If a tree falls when we don't live in town, did it really happen? Yep...it did :(


















Dang, that's a LOT of tree in the yard!! Insurance deductible is way too high to think about using it at $2500. Hum, bad choice on our part when we first purchased, eh? Oh well, live and learn. So looks like our next weekend is booked. Sigh. Oh well, we needed to go there anyway.

Friday, April 17, 2015

Tile work - last video from the Tile Man

here is the final pictures from the tile person.

No final pictures - they will come from me when we get down there.  We had planned to go this weekend, but regretfully kids schedules are playing havoc.  Drat it!!

Maybe it's better this way as it's too wet to drag any furniture down there in the truck... so if we wait we may be able to take a washer/dryer and a few odds and ends down there in the truck and empty our poor overflowing garage a bit!

Wednesday, April 15, 2015

Tile update




Tuesday morning. The kitchen was 98% done. (Looking towards the carport door)


Hall way is looking good (looking towards the front door)


Hallway looking towards the bedrooms.


Living room


Bunk room.

Once the kitchen is grouted we are officially done. Then Butch and I will head on down over the weekend to check it out and drop off odds and ends furniture.

Tuesday, April 14, 2015

Tile update




As of late Sunday night they had turned the corner and we're making their way into the living room.


As of Monday night the living room is complete.

Comments indicate the back two rooms (master and 2nd) are done to include grout. The bunk room and hall require grout as well as the living room. Their goal is to finish the kitchen Tuesday and grout the other rooms that have been completed.

I guess they will grout the Kitchen Wednesday morning as the tile has to dry for 24 hrs before grout. Unsure what happens if you grout too soon after laying tile.

The good news if it's drying time before weight is put in the tiles, we're good as we're not going to be back in the house for a few more weeks.

Sigh. I really want to go and wrap it up, but as always life gets in the way. Not enough time in the weekend to accomplish enough.

Next up drywall repairs?

Sunday, April 12, 2015

Tile update




Back bedroom. Looks good, no more haze. All cleaned up


Bunk room getting ready for grout


Hallway looking really good
It's all coming together!

Gardening in the rain...

I decided to get some mulch for the Iris today ...


All done! Looking good!!


Had enough to get the essentials in a few other beds like around theses new plants on the corner. The decorative garlic is a transplant from Sally and is loving it there!


And of course who can resist flowering annuals while shopping? NOT me. Below them are (centered) a transplant from Virginia that is to be a blood red Iris or Lily. I can't remember which. One of the gals from my old business area (Navy counterpart) gave everyone who wanted any clumps of these plants. This is year two after transplant and it's come up and done well both years but so far no blooms. There are a few bulbs on each side of the right side one that were almost killed in the locker. Hopeful they'll all survive however so far only two have made an appearance.


The daffodils have come and gone and the amaryllis are just now getting blooms on them. And the elephant ear aren't fat behind. I'm thinking of using the foreground for some pea cages this year.
And of course some petunias to add a touch of color on this side as well.

And I need about 10+ more bags of mulch. That was 6 bags and I forgot to take a picture of the bed by the garage as it also got some much needed mulch. As well as by the gate/pool equipment. That area just wasn't "pretty" so I opted to just not show you :)

Saturday, April 11, 2015

Grout has begun!




First cleanse on the first guest room. Looking good even with a bit of a haze still showing. I'm thinking this is looking really good!


And the master bedroom as well. Looking GREAT! They're rocking right along!

Progress in the tiny house

Friday's work:


It all started at the end of the hallway.


Level. A little much on the thinset but other than that it's level. ;)


The finished room. I think this is the guest room at the back of the house.


This is prior to cleanup and grouting. Lookin good and hard for me not to jump in the car and run down there to check it all out in person. Sally has been my eyes on the project and says it's VERY pretty in person.

On the Homefront.




The Iris that were transplanted from the front flower bed under the pines are MUCH happier in their new location along the fence. There's a number of blooms ready to pop open. Most are purple, but there's a yellow that will open I. The next few days.


The side flower bed. These are the Iris that were rescued from beside the drive. Again MUCH happier here and getting ready to bloom!!


And the wisteria has decided it's time to bloom as well it's a few weeks behind its wild counterparts around town but looking good!!


The two sides should meet in the middle this year as well


And the yellow bloomed this morning before I thought it would. So pretty!! I really need to put down some more mulch!!


And here is my minimize forest where I dump all my pool tuck into the flowerbed. The seeds sure germinate well after a pool soak apparently. :)

Friday, April 10, 2015

Angela news!!




Look who is going to get her braces OFF!!! Yay!!!

It's begin to look a lot like floors!!




Floor shown here with "abrasive remover" on the floor. Apparently it has to sit for couple hours, then will be scraped up. The process then calls for another wet vac, the. wash with clean water then vac it again. What a process!


The dumpster finally arrived and is being filled! Lots of bags of flooring.


Here is the scraping of the floor. Ewh!!!


And here is the result of all that hard work. BEAUTIFUL!!! I'm shocked how nicely it cleaned up!

Next up tile!!!!!

Wednesday, April 8, 2015

Tile, tile, tile!

Ok not really, really it's destruction everywhere!
But it's PROGRESS!


So happy to see the stinky flooring GO!!
The report was in by the end of the evening the entire floor is UP!
Talk about thrilling!

And kinda disgusting looking at what's in the "crack" areas..looks iffy, doesn't it?

Tuesday, April 7, 2015

Saying Prayers and having faith.

This month I am saying prayers and having faith that things will ALL work out just fine.

I was in Florida over Angela's spring break - we painted the kitchen cabinets (as you can tell from the prior posts with photos. You would think "why on earth were you there a WEEK and only got the cabinets done?" Well, its HARD work painting cabinets that are raw wood. Raw OLD wood with lots of sap apparently still IN them. They are pine (they apparently were the all the rage in the 60's). Anyway, I digress, my arms were wore out, but the cabinets got the much needed coats of paint, the supplies were all purchased in an effort to prep for the general contractor who had indicated April was MY month for flooring and other work. Well, a number of emails were sent to him to keep HIM in the loop, but apparently that is NOT the way HE does business... I hate that, I'm an information whore. Slut? Either way I love me some information. I love TMI; I want to know it ALL, thank you very much. Every gritty gory detail, yes, please.

The contractors in this area? Nope, nada, no information. Nope, nope, nope. If they give you information, well, then you would be able to plan your life. Heaven forbid!!

So, Butch calls said contractor to confront his lack of communications and confirm the April time frame. He was met with hemming and hawing and "I never told her a specific, and I wasn't solid on that timeline." June is now his offered timeline. WHAT??? Ok, thanks for making me wait from January to April THEN blowing me off... goodness, when you KNEW it wasn't looking good for April, why not give me a heads up and TELL me that it's not looking good. Makes for much happier possible future customers. UGH. We are now NEVER to be customers of him. I will avoid him even if I have to learn how to patch BIG holes in drywall myself or pay through the WAZOOO to hire someone else.

So, guess what I did? I whined. Yep, I whined on Facebook. Should I be proud? Probably not, but hey, guess what???? It led me to a Brother-in-law of a Facebook friend. Said BIL is looking for work and his specialty is tile and he's MORE than willing to start NOW on my little house? Say WHAT??? Yes, after a little back and forth via Facebook instant chat, discussions of cost, exchange of pictures we have struck a bargain for him to travel to Florida and do the demo and installation of tile in the tiny house. Yep, the deal was struck without so much as a phone call. I did, however, call him today to discuss some things as he's going from ATL to Florida and it doesn't make sense to add time to his drive to come HERE to get a key THEN drive down to FWB, so we're making arrangements to get the key from Sally to him so he can do the work started.

I've actually seen his work at the base here, their company did the bathrooms in the buildings I used to work in - floor to ceiling and they are still standing and looking wonderful so that's a bonus!

So, I'm saying prayers and having faith that this will be a wonderful solution to the issue at hand. A person I know by association will benefit and having a job that is needed and I'll get a floor.

We're not looking at the cost factor (much), we're looking at the "OMG, shoot me now, just get this dang floor done" mode. I was going to call Home Depot and Lowes and get them to quote it and I'm sure that they would have been a similar rate to what I'll be paying now... so we're saying prayers and having faith that the end product will blow us away and we'll live happily ever after :)

The same goes for the Home/Home front. I have had a string of things just simply fall apart. I got home from Sams Saturday and opened the back door and heard a rattle. I looked around and found that the knob for the dead bolt was laying on the floor. Hum. That's weird! Butch was nice and put it all back together for me while I unloaded our Sam's goodies. Then there was a loud CRUNCH, bang, rattle when we went to open the garage - the garage door chain popped loose and it turned out to be the gears in the motor. Oh, yeah, things just keep getting better and better. THEN as they were coming in from moving the car and coming through the front door, I hear a 'tinkle, tinkle, awh, you have GOT to be kidding me' as Butch was opening the front door the front leaver knob had fallen right off the door. Ha! He was also able to Fix that with some elbow grease and a screwdriver to tighten things up. OK, so we've had our THREE things... so we're done now... no more of this, please!!

So prayers and happy thoughts for the homestead and the tiny house that life goes smoothly and we're able to open "house" down there for rental weekends SOON!!!

Friday, April 3, 2015

Freedom!!!! (Coming in one year and one day!!)




Taking her test!!


Success!!! I can seem freedom in the distant future!!


Driving Reba (the RAV4) on day one.

Wednesday, April 1, 2015

No more paint ever. (Please???)

No really.
I. Never. Want. To. Paint. Again.


Two coats of trim. Note the fridge is moved. The water supply line was long enough to reach over to there after being released from its coil. We taped it down and shut it off, but I wasn't strong enough to get it off the spigot under the sink :o/


Doors for the lower cabinets and drawers. Still debating the wisdom of painting the drawers but they were HORRID. So. They had to be dealt with.


Doors for the uppers drying.


All of the lower cabinet items drying.


The cabinets done and waiting for Angela and I to get cleaned up and get hardware from Home Depot.


Doors all lined up in order of installation. And paint items drying on the ladder.

So... We came home to get showered and head to the store to get hinges. Found the ones that look just like the old ones but in a nickel color. Find hinges. Find magnetic latches. Get one of the door pulls to see how it looks on the doors. (Silver with glass) Get 15 sixteen foot long pieces of shoe moulding. Get that strapped to the top Of the car. Drive home. Comedy of errors getting the LONG pieces of shoe mould bundle into the house. No windows were lost however a few chuckles where had.

We then put the hinges on the cabinets and they don't quite fit. Sigh. Ok. Give up on that one. Move to the door handle. Nope. The hole isn't all the way through the door. Sigh. Ok. Give up on that one. Move to the door in the hallway and they are the wrong size. Yeah, it's time to go on to the house. On that note amid much chuckles and ribbing of each other with "oh NOOOO, we don't need the original to compare sizes, they're all the same".

Hahahaha. Horrible. So we quit and came back to the house to a wonderful dinner with Sally! Always a great dinner with Sally :)