Well, the kitchen cabinets are on order - good bad or indifferent they are on order and set to be delivered and installed on or about the 19th of this month.... when I plan to be on sight in FL.
The gas line extension is on schedule for Monday for the 15th. So... things are coming together. AND if I get everything in place soon enough, measurements for the countertop?
One can hope, right?
NOW I’ll need to add the shaker look to the OLD cabinets – however, since it’s not all visible in one look (well, not from the door) I’ll hold off on that for a bit.

No comments:
Post a Comment